The two contracts being delivered by Leighton Asia for the Central Wanchai Bypass project include the Central Interchange and Route-Wide System and Commissioning.
Works included a 220-metre-long tunnel section, tunnel buildings, realigning and reconstructing existing roads, fit out of the tunnels, plus the installation and commissioning of all tunnel services. The link is expected to cut travelling time between the eastern and western ends of Hong Kong Island from about half an hour to five minutes.
Comentarios