The project comprised the construction of a 40 000 sqm, 30 m high Passenger Clearance Building, including pile foundations, concrete structure, profiled steel roof, curtain walling and glazing, architectural finishes and mechanical and electrical works.
The building roof, complete with cladding and M&E installations, was prefabricated in large sections in an assembly yard in China, which facilitated an installation period on site of only eight months.
The M&E works included a cooling plant for all facilities on the island with sea water heat rejection and a dual redundant SCADA control system.